Time
Constraint-based plans and drawings were used as a tool to enable integrated planning. They served to establish the parameters of the parallel worlds in collaboration with the architects, authorities, technical partners and building contractors. In the detailed construction documentation, the constraint-based plans are replaced by the installation plans. These provide an overview of the entire underground network.