Farbgebung Betonplatten Campus WU
Material
An important role of the Master Plan was to specify the colour spectrum of the cement tiles. The cross-campus pedestrian walkway has a length of 600m, hence the need to pave large areas. To break up the monotony of grey concrete, nuances were inserted in yellow.